Explore ZBrain Platform
Tour ZBrain to see how it enhances legal practice, from document management to complex workflow automation. ZBrain solutions, such as legal AI agents, boost productivity.
ZBrain RFQ/RFP Response Screening and Analysis Agent automates the evaluation of vendor responses against detailed RFQ specifications and internal evaluation criteria. Utilizing a Large Language Model (LLM), it thoroughly assesses key components of RFQ response documents, such as technical specifications, project scope, and pricing terms, etc., and generates detailed reports.
Businesses in today’s competitive market struggle with the manual review of vendor responses to Requests for Quote (RFQs) and Requests for Proposal (RFPs), which is both time-consuming and prone to errors. This often leads to inconsistent evaluations and potential oversights in vendor selection, compounded by the limited scalability of manual reviews that delay decision-making. Additionally, manual evaluations can introduce subjective biases, affecting the fairness and transparency of the selection process.
ZBrain RFQ/RFP Response Screening and Analysis Agent transforms the RFP/ RFQ vendor response evaluations by ensuring consistent, objective, and efficient assessment. It automates the analysis of RFQ/RFP vendor responses, generating detailed reports that summarize each response's alignment with specified RFQ criteria and highlight any gaps. Insights from these reports provide actionable intelligence for informed vendor selection, enhancing strategic decision-making and giving businesses a competitive edge. This automation reduces manual effort, enhances accuracy, and accelerates the decision-making process.
ZBrain RFQ/RFP response Screening and analysis agent automates the entire workflow of evaluating RFQ and RFP responses, optimizing the process from RFQ response submission to final decision. The steps outlined below detail the agent's workflow from the initial document input to continuous improvement.
In this step, the agent supports RFQ response document uploading and its classification for detailed analysis.
In this step, the agent extracts relevant RFP requirements and utilizes established rules and criteria from the knowledge base for a comprehensive evaluation.
In this step, the agent generates detailed evaluation reports for each RFQ/RFP response.
After the RFP response evaluation process, the agent incorporates user feedback to enhance the accuracy and effectiveness of the evaluation process.
Sample of data set required for RFQ Response Screening and Analysis Agent:
PRICING PROPOSAL
ATLAS MANUFACTURING ELECTRICAL SYSTEMS UPGRADE
RFQ Number: EE-2025-0042
1. EXECUTIVE PRICING SUMMARY
ElectraTech Solutions is pleased to provide the following comprehensive pricing for the Atlas Manufacturing Electrical Systems Upgrade project:
Category | Price |
---|---|
Equipment and Materials | $2,875,250 |
Installation Labor | $1,435,500 |
Engineering and Project Management | $375,000 |
Testing and Commissioning | $125,000 |
Training and Documentation | $55,000 |
Total Project Investment | $4,865,750 |
This fixed-price proposal includes all equipment, materials, labor, engineering, management, and services required to complete the project as specified in the RFQ and our technical proposal. All prices are in US Dollars and remain valid for 90 days from the proposal submission date.
Item | Description | Quantity | Unit Price | Extended Price |
---|---|---|---|---|
1.1 | Siemens SIVACON S8 4000A Main Switchgear | 1 | $485,750 | $485,750 |
1.2 | GE Spectra Series 800A Distribution Panels | 12 | $28,500 | $342,000 |
1.3 | Schneider Electric 75kVA Transformers | 4 | $18,750 | $75,000 |
1.4 | Schneider Electric 150kVA Transformers | 4 | $32,500 | $130,000 |
1.5 | Eaton 9395P 200kVA UPS System | 1 | $235,000 | $235,000 |
1.6 | Distribution Feeders and Branch Circuit Materials | 1 lot | $175,000 | $175,000 |
Subtotal - Power Distribution Equipment | $1,442,750 |
Item | Description | Quantity | Unit Price | Extended Price |
---|---|---|---|---|
2.1 | Allen-Bradley ControlLogix 5580 PLCs | 15 | $18,500 | $277,500 |
2.2 | Allen-Bradley CENTERLINE 2100 MCCs | 4 | $125,000 | $500,000 |
2.3 | Control System Network Components | 1 lot | $85,000 | $85,000 |
2.4 | Control Panels and Interface Equipment | 1 lot | $65,000 | $65,000 |
Subtotal - Control Systems | $927,500 |
Item | Description | Quantity | Unit Price | Extended Price |
---|---|---|---|---|
3.1 | Philips Gardco LED High Bay Fixtures | 450 | $625 | $281,250 |
3.2 | Lighting Control System | 1 lot | $87,500 | $87,500 |
3.3 | Emergency Lighting Equipment | 1 lot | $45,000 | $45,000 |
3.4 | Lighting Installation Materials | 1 lot | $28,500 | $28,500 |
Subtotal - Lighting Systems | $442,250 |
Item | Description | Quantity | Unit Price | Extended Price |
---|---|---|---|---|
4.1 | Schneider Electric EcoStruxure Power Monitoring | 1 | $125,000 | $125,000 |
4.2 | Arc Flash Protection Equipment | 1 lot | $85,000 | $85,000 |
4.3 | Emergency Power Off System | 1 lot | $55,000 | $55,000 |
4.4 | Personal Protective Equipment | 1 lot | $12,750 | $12,750 |
Subtotal - Energy Management and Safety Systems | $277,750 |
TOTAL EQUIPMENT AND MATERIALS: $2,875,250
Phase | Description | Hours | Rate | Extended Price |
---|---|---|---|---|
1 | Engineering & Design | 1,200 | $125 | $150,000 |
2 | Primary Infrastructure | 3,600 | $115 | $414,000 |
3 | Secondary Systems | 4,800 | $115 | $552,000 |
4 | Control Systems | 2,250 | $125 | $281,250 |
5 | Testing & Commissioning | 350 | $125 | $43,750 |
Subtotal - Labor by Phase | $1,441,000 |
Classification | Standard Rate | Overtime Rate | Weekend Rate |
---|---|---|---|
Project Manager | $150/hour | $225/hour | $300/hour |
Lead Engineer | $145/hour | $217.50/hour | $290/hour |
Senior Electrician | $125/hour | $187.50/hour | $250/hour |
Journeyman Electrician | $115/hour | $172.50/hour | $230/hour |
Controls Specialist | $135/hour | $202.50/hour | $270/hour |
Apprentice/Helper | $75/hour | $112.50/hour | $150/hour |
Note: Labor estimates include standard, overtime, and weekend rates as appropriate for the implementation schedule.
TOTAL INSTALLATION LABOR: $1,435,500
Item | Description | Quantity | Unit Price | Extended Price |
---|---|---|---|---|
1 | Project Management | 1,200 hours | $150 | $180,000 |
2 | Engineering Services | 950 hours | $145 | $137,750 |
3 | BIM/CAD Services | 450 hours | $95 | $42,750 |
4 | Administrative Support | 240 hours | $60 | $14,500 |
Subtotal - Engineering and Project Management | $375,000 |
Item | Description | Quantity | Unit Price | Extended Price |
---|---|---|---|---|
1 | Pre-Installation Testing | 1 lot | $35,000 | $35,000 |
2 | In-Process Testing | 1 lot | $25,000 | $25,000 |
3 | Final System Commissioning | 1 lot | $45,000 | $45,000 |
4 | Arc Flash Study and Labeling | 1 lot | $20,000 | $20,000 |
Subtotal - Testing and Commissioning | $125,000 |
Item | Description | Quantity | Unit Price | Extended Price |
---|---|---|---|---|
1 | Operation and Maintenance Training | 80 hours | $250 | $20,000 |
2 | System Documentation | 1 lot | $25,000 | $25,000 |
3 | As-Built Drawings | 1 lot | $10,000 | $10,000 |
Subtotal - Training and Documentation | $55,000 |
ElectraTech Solutions offers the following optional services and equipment enhancements:
Item | Description | Price |
---|---|---|
1 | Extended Warranty (Additional 2 years beyond included 5-year warranty) | $225,000 |
2 | Premium Maintenance Package (3-year term) | $175,000 |
3 | Energy Performance Guarantee (5-year term) | $125,000 |
4 | Advanced Analytics Package | $85,000 |
5 | Remote Monitoring Service (Annual) | $45,000 |
6 | Additional Training (40 hours) | $12,500 |
7 | Spare Parts Package | $65,000 |
ElectraTech Solutions proposes the following payment schedule:
Milestone | Percentage | Amount | Expected Date |
---|---|---|---|
Contract Award | 15% | $729,862.50 | June 15, 2025 |
Design Completion | 10% | $486,575.00 | August 10, 2025 |
Major Equipment Delivery | 30% | $1,459,725.00 | September 7, 2025 |
Primary Infrastructure Completion | 15% | $729,862.50 | September 25, 2025 |
Secondary System Completion | 15% | $729,862.50 | November 15, 2025 |
Substantial Completion | 10% | $486,575.00 | December 12, 2025 |
Final Acceptance | 5% | $243,287.50 | December 30, 2025 |
Total | 100% | $4,865,750.00 |
ElectraTech Solutions has prepared a 10-year Total Cost of Ownership (TCO) analysis to demonstrate the long-term value of our solution:
Category | Current System | Proposed Solution | Savings |
---|---|---|---|
Initial Investment | N/A | $4,865,750 | -$4,865,750 |
Energy Costs (10 years) | $16,200,000 | $12,318,750 | $3,881,250 |
Maintenance Costs (10 years) | $2,850,000 | $1,625,000 | $1,225,000 |
Downtime Costs (10 years) | $7,500,000 | $1,875,000 | $5,625,000 |
Replacement Parts (10 years) | $1,450,000 | $725,000 | $725,000 |
End-of-Life Value | $125,000 | $550,000 | $425,000 |
Net 10-Year TCO | $27,875,000 | $20,859,500 | $7,015,500 |
Notes on TCO Analysis:
Validity: This pricing proposal is valid for 90 days from the submission date.
Taxes: Prices do not include applicable sales or use taxes. Atlas Manufacturing will be responsible for any taxes, fees, or duties that may apply.
Permits: Costs for standard electrical permits are included. Special permits, if required, will be processed at cost plus 10%.
Working Hours: Base pricing assumes work performed during standard business hours (7:00 AM – 5:00 PM, Monday through Friday) except where weekend work is specifically noted for transitions. Premium time is included for scheduled weekend transitions.
Site Access: Pricing assumes reasonable access to all work areas during scheduled work periods.
Hazardous Materials: Proposal does not include removal or abatement of hazardous materials (e.g., asbestos, lead paint). If encountered, such work will be addressed through the change order process.
Existing Conditions: Pricing assumes existing electrical infrastructure is in the condition represented during the site visit. Significant undisclosed deficiencies may require additional work through the change order process.
Salvage: Unless otherwise specified, all removed electrical equipment becomes the property of ElectraTech Solutions. Salvage value has been factored into pricing.
Changes: Any changes to scope, schedule, or requirements will be addressed through a formal change order process with associated cost and schedule impacts.
Payment Terms: Net 30 days from invoice date. Late payments subject to 1.5% monthly finance charge.
ElectraTech Solutions is providing the following value-added offerings at no additional cost to Atlas Manufacturing:
Extended Warranty: Standard 3-year warranty extended to 5 years on all equipment and labor at no additional cost ($175,000 value)
Quarterly Health Checks: Quarterly preventive maintenance inspections during the warranty period ($45,000 value)
Energy Baseline Study: Comprehensive energy usage analysis prior to implementation to establish accurate baselines ($15,000 value)
Enhanced Training: Standard 40 hours of training extended to 80 hours customized for Atlas personnel ($20,000 value)
24/7 Priority Support: Dedicated support line with 4-hour response guarantee for critical issues during warranty period ($35,000 value)
Total Added Value: $290,000
ElectraTech Solutions' pricing proposal represents an exceptional value for Atlas Manufacturing, balancing initial investment with long-term operational benefits. Our solution delivers:
We are confident that this represents the best overall value for Atlas Manufacturing's critical electrical infrastructure upgrade and look forward to the opportunity to deliver this important project.
For questions regarding this pricing proposal, please contact:
Sarah Chen, P.E., PMP
Senior Project Manager
ElectraTech Solutions, Inc.
(216) 555-3240
schen@electratechsolutions.com
Sample output delivered by the RFQ Response Screening and Analysis Agent:
Document Type: Pricing Sheet
Evaluation Criteria:
- Pricing Structure:
- Equipment Costs
- Installation Costs
- Engineering and Project Management
- Ongoing Costs
- Payment Terms
- Total Cost of Ownership
Comparison Summary:
Equipment Costs:
- Findings: The pricing sheet provides a detailed breakdown of equipment including manufacturer, model numbers, specifications, unit prices, and extended prices for each item. Volume discounts are not mentioned.
- Compliance Status: Pass
Installation Costs:
- Findings: Detailed installation labor by phase and labor rates by classification are provided, including overtime and weekend rates. Subcontractor costs are not specifically outlined but may be embedded within phases.
- Compliance Status: Partial
Engineering and Project Management:
- Findings: Engineering and project management costs are detailed including project management, engineering services, BIM/CAD services, and administrative support.
- Compliance Status: Pass
Ongoing Costs:
- Findings: Optional services such as extended warranty, premium maintenance package, and remote monitoring service are outlined, but software licensing and help desk support are not explicitly detailed. Warranty costs cover extended options.
- Compliance Status: Partial
Payment Terms:
- Findings: Payment schedule tied to project milestones is presented. Early payment discounts are not mentioned; retention terms of 10% are standard and not explicitly addressed.
- Compliance Status: Partial
Total Cost of Ownership:
- Findings: The pricing sheet does not provide a 10-year cost analysis including energy consumption estimates and other ongoing costs like replacement parts and licensing fees.
- Compliance Status: Fail
Gap Analysis:
Evaluation Summary:
ElectraTech Solutions has provided a comprehensive and detailed pricing proposal for equipment, installation, and project management costs. The document meets some requirements for compliance with RFQ expectations, primarily in the detailed breakdown of initial costs. However, it inadequately covers some aspects of ongoing costs and total cost of ownership, which adversely affects its overall compliance status in terms of long-term financial planning. Further information or amendments could enhance the competitiveness of this proposal regarding strategic financial insights for Atlas Manufacturing.
Ensures tax info on purchase orders complies with legal standards, reducing manual checks and minimizing compliance risks.
Automates supplier contact updates in the procurement database, ensuring accuracy and reducing manual effort.
Tracks and documents procurement contract changes, ensuring compliance with internal policies and enhancing transparency.
Quickly identifies and highlights penalty clauses in procurement contracts for efficient risk assessment and review.
Ensures vendors meet compliance standards pre-selection, automating checks to reduce risks and streamline procurement.
Monitors supplier delivery schedules, flags delays, and aids procurement teams in implementing corrective actions to enhance supply chain efficiency.